The Connecting Europe Facility is a key EU funding instrument to promote growth, jobs and competitiveness through infrastructure investment at European level.
The objective of this call is to modernise maritime transport infrastructure on the TEN-T network and reducing the environmental impact of transport through efficient short sea shipping links and greening of inland shipping.
Scope:
Only works projects related to:
For projects supporting the deployment of Onshore-power supply and charging infrastructure in TEN-T maritime and inland ports:
For merged port entities or entities managing more than one maritime port, only the geographic area of the maritime port indicated in Annex II to the TEN-T Regulation may be included in the project.
For the projects supporting fitting or retrofitting of energy systems of short sea shipping vessels’ (including ferries) and inland waterway vessels, the support shall be provided to:
Support shall be limited to the costs of fitting or retrofitting of the vessels’ energy systems (the fully electric or hybrid power propulsion system, wind-assisted propulsion system, substitute sources of energy and energy storage system both used predominantly for a propulsion system). Applications shall contain a clear cost breakdown per component / equipment necessary for the fitting / retrofitting of the vessels’ energy system(s).
More specifically, the support to power propulsion system shall be limited to:
The hybrid electric vessels must have, as a result of fitting or retrofitting, Shore-side Battery charging (SBC) and their battery capacity shall be sufficient to cover at least 10 Nautical miles.
The fitting or retrofitting contract must be signed after the call publication date and no later than 31 December 2027.
Support shall not be provided to Exclusive Day trip tourism vessels, recreational craft, tugboats, icebreakers or cruise vessels.
The applicants shall indicate what fuelling and recharging capacities are currently or will be available by the end of the project at the ports served by the supported vessels.
The applicants should explain the contribution of their proposed project to the development of EU manufacturing capacity and made in EU technologies in line with the EU Industrial Maritime Strategy.
For the fitting or retrofitting of the vessels, the grant amount shall be limited to a maximum of €5 million per vessel.
The vessels receiving support must fly an EU flag and shall serve at least one TEN-T maritime or inland port for a minimum of 5 years after the end of the project.
Non eligible costs
In order to ensure efficiency in EU funding interventions, applicants are strongly encouraged to submit applications for projects with a total requested EU contribution to the eligible costs of no less than €1.000.000. Where possible, related projects should be grouped and submitted as one proposal.
The maximum EU contribution per grant agreement shall be capped at €10.000.000.
In addition, the maximum EU contribution related to the fitting or retrofitting of the energy systems shall be capped at €5.000.000 per vessel.
Proposals requesting higher amounts will be declared ineligible.
The grant awarded may be lower than the amount requested.
In order to be eligible, the applicants (beneficiaries and affiliated entities) must:
Beneficiaries and affiliated entities must register in the Participant Register — before submitting the proposal — and will have to be validated by the Central Validation Service (REA Validation). For the validation, they will be requested to upload documents showing legal status and origin.
Ministry of Transport, Communications and Works
Department of Public Works
Website: https://www.mcw.gov.cy/
Address: 165 Strovolou Avenue, 2048 Strovolos
Telephones: 22806954, 22806537
Email: info@pwd.mcw.gov.cy
Contact person:
Elpida Epameinondas
Senior Executive Engineer
Τelephone: +357 22806643
Email: eepamenonda@pwd.mcw.gov.cy