Europe’s Rail Joint Undertaking (EU-Rail) aims to deliver, via an integrated system approach, a high-capacity, flexible, multimodal, sustainable, reliable and integrated EU railway network for European passengers and cargo.
The Flagship Project stemming from this topic shall develop under the following capabilities the enablers and any other which may contribute to deliver the aforementioned expected outcome with the associated maturity level foreseen (up to – depending of the Use Case):
The Flagship Project stemming from this topic shall develop under the following capabilities the enablers and any other which may contribute to deliver the aforementioned expected outcome with the associated maturity level foreseen (up to – depending of the Use Case):
Capability for Information sharing across the supply chain and TMS
Enabler 1: Scalable information platform to integrate and exchange information (e.g., asset health, maintenance planning, fleet operation, etc.) across the supply chain and TMS, requiring necessary management and sharing agreements between the involved actors at TRL7 in 2028, and amongst others:
Capability for Unmanned and non-invasive monitoring and inspections
Enabler 2: Improved (in terms of cost reduction and/or better accuracy) asset diagnostic and inspection systems, as well as advanced, context aware, unmanned automated monitoring and inspections solutions at TRL7 in 2028, and amongst others:
Capability for Advanced and holistic asset decisions
Enabler4: New methodologies and technologies to leverage advanced and holistic asset decisions during the span of their life cycle at TRL7/8 in 2028, based on:
Enabler 5: Digital Twins integrated with BIM, GIS tools, and Virtual and Augmented Reality to enable agile visualization for different stakeholders of asset health status (historical, current, and forecasted) in various use cases at TRL 7 in 2028.
Capability for Advanced and holistic design and certification of assets
Enabler 6: Advanced and holistic design and certification of assets, at TRL 6/8 in 2025, based on:
Capability for Remotely controlled, unmanned and metadata-assisted interventions
Enabler 7: Development of remotely controlled, unmanned and metadata-assisted interventions in construction, maintenance, and renewal operations, based on:
Developments on all those enablers should also cover important preparatory works with higher TRL for the future set of demonstration foreseen in the Multi- annual Work programme in view of the evolutions of the solutions.
For Research & innovation and demonstrations activities (within the action) making use of data models related to the interoperability or safety of the rail system, those data models should be aligned with the ERA Ontology. This ontology defines the conceptual framework and the specific terms and relationships for the interoperability or safety of the rail system in the EU that shall be used or where relevant extended. This includes the reuse of the ERA ontology with its semantic artifacts (shacl rules, skos ..) and in cases where it is not sufficient, extensions should be proposed to maintain semantic consistency and interoperability across systems. Those extensions proposals should cover the processes to validate extension to the ERA Ontology with compliant datasets and related competency questions and linked SPARQL queries based on interoperability testbed validation tools (Interoperability Test Bed Guides — ITB Guides). Corresponding documentation should also include any mappings or transformations considered in the Research & Innovation activities and any assumptions made.
60%
The general admissibility and eligibility conditions are described in Annex A, Annex B and Annex E of the Horizon Europe Work Programme General Annexes.
For additional information about the eligibility conditions and the special skills and/or capabilities expected from the applicant(s) under each call, please visit the description of the topic of your interest in the Europe’s Rail Work Programme 2025-2026 (the link can be found under the “Further information” section of this email).